The objective is: 
5709
The running time is: 
36.8837
The time meeting best is: 
36.8834
Location: 1(load: 2894) 
 Route 0(load: 431) 25 7 20 8 3 5 22 14 
 Route 1(load: 835) 11 26 10 9 24 4 17 47 61 64 50 51 12 15 6 23 18 21 
 Route 2(load: 791) 63 46 48 55 52 53 62 28 45 19 16 
 Route 3(load: 837) 36 31 32 42 43 132 114 116 113 41 40 35 33 37 39 38 56 34 
Location: 2(load: 2478) 
 Route 0(load: 821) 119 129 112 121 120 13 2 27 1 0 
 Route 1(load: 811) 131 108 118 126 107 127 133 130 128 123 124 
 Route 2(load: 846) 115 122 111 109 110 117 
Location: 3(load: 2539) 
 Route 0(load: 832) 90 88 81 98 99 100 101 125 84 29 44 30 86 58 60 49 87 73 89 
 Route 1(load: 850) 69 77 71 76 75 72 74 79 67 66 57 54 65 59 83 
 Route 2(load: 829) 80 78 68 70 91 96 104 95 97 103 93 105 94 102 106 82 92 
 Route 3(load: 28) 85 
The actual cost is 5709
